4 Options for Your Project (2024)

Filed under Uncategorized • 5 minute read

When it comes to paving materials, gravel is one of the most versatile and commonly used options. Gravel comes in many different forms and can be used for anything from landscaping to building actual roads with a high traffic volume.

4 Options for Your Project (1)

When using gravel for pavement intended to handle vehicle and/or foot traffic, certain types of gravel fare better than others. Some people even prefer gravel that hardens like concrete, for maximum durability.

When it comes to this type of gravel, there are a few different types that each have their own pros and cons.

In case you’re in need of a more durable type of gravel, let’s have a look at some types that harden like concrete:

Dense Grade Gravel

4 Options for Your Project (2)

Dense grade gravel is made from small stones and crushed stone dust. It’s usually made from crushed limestone, trap rock, granite, or some combination of those three.

When compacted, this is a type of gravel that hardens like concrete and forms a semisolid surface that’s able to stand up to the rigors of vehicle and foot traffic. This type of gravel is considered practical and functional, but not exactly aesthetically pleasing.

It should also be mentioned that dense grade gravel is not very permeable due to the nature of its composition and should be avoided in wet climates.

Decomposed Granite

Decomposed granite is a type of gravel made from 100% pulverized granite. This type of gravel is ground into fine particles and will pack together to form a gravel that hardens like concrete when compacted.

Decomposed granite has suitable drainage properties for hardscaping, however, it’s not capable of draining water fast enough during high-volume rainfall. This is because the particles are too fine and don’t give enough space for water to drain through at a quick rate.

There are also two types of decomposed granite surfaces, stabilized and unstabilized. Unstabilized granite is granite that has just been packed down with no added stabilizers like chemical hardener or pavers. This is the cheapest option but completely untenable for paved surfaces expecting traffic, due to the rapid misplacement and deterioration of the granite.

Stabilized decomposed granite will last much longer and can achieve higher levels of permeability with the right type of pavers. Chemical hardeners like GraniteCrete can be added to this type of gravel to make it even sturdier and lessen maintenance requirements. This type of additive will typically reduce the permeability to almost zero, however.

Hard Pack Gravel

Hard pack gravel is comprised of multiple types of gravel. The base is usually made up of pea stone gravel, with finer types of gravel layered over the top.

Hard pack gravel provides excellent drainage because its base layer provides more room for water to drain through. The upper layers provide superior traction and stability as well, especially when stabilized.

Unstabilized hard pack gravel suffers the same downsides as every other type of unstabilized gravel, namely an extensive amount of maintenance. With stabilizing pavers, however, hardpack gravel is actually the most durable type of gravel that hardens like concrete.

By utilizing TRUEGRID permeable plastic pavers, you can achieve 100% permeability as well, making hard pack gravel the optimal choice if you’re looking for top performance in all the relevant areas like durability, maintenance, etc.

TRUEGRID Pavers Can Make Gravel Last Longer Than Concrete

The main downside to using gravel as a paving material is that it’s cheap and breaks down easily. Gravel spreads and disintegrates in no time, requiring you to constantly replace it and rake it back into place.

4 Options for Your Project (3)

By implementing a gravel-stabilizing solution like permeable plastic pavers from TRUEGRID, you can lock your gravel into place and prevent it from spreading or breaking down. TRUEGRID PRO LITE and PRO PLUS pavers are compatible with almost every type of gravel, and not having to worry about durability opens up your options.

Limestone, granite, peastone, trap rock, and many other common types of gravel are perfectly compatible with TRUEGRID pavers. This means not only will you be able to reap the benefits of increased durability and permeability, you’ll also have complete stylistic versatility.

The installation process for these pavers is incredibly fast and can be completed in a fraction of the time of most other paving materials. Once installed, your pavers will last up to 60 years without needing to be replaced. They require almost zero maintenance and are resistant to all deteriorating factors.

4 Options for Your Project (4)

Find the Perfect Concrete-like Solution with Stabilizing Gravel Permeable Pavers from TRUEGRID

Made from 100%-recycled plastic, TRUEGRID pavers are one of the most eco-friendly paving materials on the planet that can be used to install gravel that hardens like concrete.

If you want to create a hard, level-paved surface that outperforms concrete in every way, don’t hesitate to call TRUEGRID today and get in touch with a pavement professional who can get you pointed in the right direction.

Related Posts

5 Ways to Reduce Parking Lot Design Costs With Permeable Pavers
What are permeable driveways?
The Dirt On Soil: Soil Properties and How They Affect Your Project

Array

About the Author

View Posts From TRUEGRID® Paver

4 Options for Your Project (2024)

FAQs

What are the 4 elements of a project? ›

In conclusion, effective project management requires a comprehensive understanding of the four key elements of project management: scope, time, cost, and quality. By managing these elements effectively, you can ensure that your project is completed on time, within budget, and to the required quality standards.

What are the 4 W's of project management? ›

The five W questions are important because they help establish the framework of any project. Once you have established the answers to the 'who, what, when, where and why', you'll then have a clear picture of the tasks in front of you. With all the basic information you need, you can tackle the project successfully.

What are 4 What are the steps in the project management process? ›

The project life cycle is broken down into five project management phases: initiation, planning, execution, monitoring, closure.

What are the 4 steps of essential elements of project planning? ›

How to Make a Project Plan in 4 Steps
  • Scope and goals. A project plan should make clear what the project is aiming to achieve.
  • Schedule. The schedule outlines when the project will start and end, how long tasks are expected to take, and when milestones should be reached.
  • Tasks and milestones. ...
  • People. ...
  • Documentation.
May 7, 2024

What are the 4 main parts of a project plan? ›

Determine a project budget. Set project goals & objectives. Outline project deliverables. Create a project schedule.

What are the four 4 parts of a project description? ›

Project descriptions provide the following details to the applicants: the problem the project will address, a set of goals for the project, the overall objectives for the project, as well as a project plan that describes the activities the members will undertake.

What are the 4 C's in project management? ›

The four C's – Communication, Collaboration, Commitment, and Compassion – are interconnected and essential components of successful project management. By mastering these areas of expertise, aspiring project managers can unlock their full potential, ensuring the success of their project teams and the overall business.

What are the 4 phases of a project? ›

This project management process generally includes four phases: initiating, planning, executing, and closing. Some may also include a fifth “monitoring and controlling” phase between the executing and closing stages.

What are the four 4 pillars of project management? ›

Management of a project is one of the few topics that considers four main pillars that act as supporters during the project implementation. These four key pillars are Trust, Respect, Accountability, and Change Management.

What is project management 4? ›

The fourth project management phase, project monitoring and control, takes place concurrently with the execution phase of the project. It involves monitoring the progress of the project execution activities to ensure the project team stays on schedule and within budget.

What are the 4 steps to starting a project? ›

The project initiation process: 4 steps to get started
  • Create a project charter or business case. In this first step, you demonstrate why your project is necessary and what benefit it will bring. ...
  • Identify key stakeholders and pitch your project. ...
  • Run a feasibility study. ...
  • Assemble your team and tools.
Feb 7, 2024

What are the 4 steps of process planning? ›

1] Recognizing Need for Action · 2] Setting Objectives · 3] Developing Premises · 4] Identifying Alternatives · 5] Examining Alternate Course of Action · 6] . Planning Process comprises of: Setting Objectives, Developing Premises, Identifying alternative courses of action, Selecting an alternative, .

What are the four 4 major parts of a project life cycle? ›

4 phases of the project management life cycle. The project management life cycle is usually broken down into four phases: initiation, planning, execution, and closure. These phases make up the path that takes your project from the beginning to the end.

What 4 factors go into a project plan? ›

The four factors that go into project plan are:
  • Scope.
  • Outcome.
  • Benchmark and.
  • Role.
Oct 5, 2020

What are the core elements of a project? ›

Even for experienced project managers, it's easy to lose sight of the core elements that make up every project. Scope, time, money, and resources—these four elements tie into one another, and together, they form the fabric of a project.

What is the 4 elements process? ›

Although process initiative projects may vary, there are four key elements which assure good results. These four critical items are: (1) Process Definition, (2) Process and Activity Roles, (3) Available Tools and (4) Training.

What are the 4 phases of a project listed in order? ›

There are 4 project life cycle phases: initiation, planning, execution, and closure. And if you monitor each, you can systematize them and understand where there's room for improvement. Especially if you review them separately, instead of just treating all the phases as one big project.

References

Top Articles
Latest Posts
Article information

Author: Terrell Hackett

Last Updated:

Views: 5921

Rating: 4.1 / 5 (52 voted)

Reviews: 91% of readers found this page helpful

Author information

Name: Terrell Hackett

Birthday: 1992-03-17

Address: Suite 453 459 Gibson Squares, East Adriane, AK 71925-5692

Phone: +21811810803470

Job: Chief Representative

Hobby: Board games, Rock climbing, Ghost hunting, Origami, Kabaddi, Mushroom hunting, Gaming

Introduction: My name is Terrell Hackett, I am a gleaming, brainy, courageous, helpful, healthy, cooperative, graceful person who loves writing and wants to share my knowledge and understanding with you.